Loading organization details...
Loading organization details...
S.A.R.A., Inc. is devoted to educating communities and providing support to strengthen and heal crime victims and their families.
Source: IRS Form 990 (Tax Year 2024)
Source: IRS e-Filed Form 990 (from the IRS e-File system), Tax Year 2024
Total Revenue
▼$1.7M
Program Spending
83%
of total expenses go to program services
Total Contributions
$1.6M
Total Expenses
▼$1.2M
Total Assets
$1.8M
Total Liabilities
▼$38.6K
Net Assets
$1.7M
Officer Compensation
→$102.1K
Other Salaries
$630K
Investment Income
$3,946
Fundraising
▼$36.9K
Source: USAspending.gov · Searched by organization name
Total Federal Funding (partial)
$851.7M
Awards Found
50+
Additional awards may exist. View all on USAspending.gov →
Department of Housing and Urban Development
$210.1M
PURPOSE: COMMUNITY DEVELOPMENT BLOCK GRANT DISASTER RECOVERY (CDBG-DR) AND COMMUNITY DEVELOPMENT BLOCK GRANT MITIGATION (CDBG-MIT) GRANT FUNDS ARE APPROPRIATED BY CONGRESS AND ALLOCATED BY THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HUD) AS AUTHORIZED UNDER TITLE I OF THE HOUSING AND COMMUNITY DEVELOPMENT ACT OF 1974, AS AMENDED. THE MAIN PURPOSE OF CDBG-DR FUNDS IS TO REBUILD DISASTER-IMPACTED AREAS AND PROVIDE CRUCIAL SEED MONEY TO START THE LONG-TERM RECOVERY PROCESS. THESE FLEXIBLE GRANTS HELP CITIES, COUNTIES, INDIAN TRIBES, AND STATES RECOVER FROM PRESIDENTIALLY DECLARED DISASTERS, ESPECIALLY IN LOW-INCOME AREAS, SUBJECT TO AVAILABILITY OF SUPPLEMENTAL APPROPRIATIONS. SINCE CDBG-DR ASSISTANCE MAY FUND A BROAD RANGE OF RECOVERY ACTIVITIES, HUD CAN HELP COMMUNITIES AND NEIGHBORHOODS THAT OTHERWISE MIGHT NOT RECOVER DUE TO LIMITED RESOURCES.; ACTIVITIES TO BE PERFORMED: STATE AND LOCAL GOVERNMENTS RECEIVE CDBG-DR AND CDBG-MIT FUNDS FROM HUD TO ASSIST COMMUNITIES RECOVERING FROM A PRESIDENTIALLY DECLARED DISASTER. HUD ALLOCATES FUNDS BASED ON THE UNMET RECOVERY NEEDS OF EACH COMMUNITY. HUD ISSUES AN ALLOCATION ANNOUNCEMENT NOTICE IN THE FEDERAL REGISTER WHICH WILL INCLUDE THE LIST OF GRANTEES, ALLOCATIONS, AND ANY WAIVERS AND ALTERNATIVE REQUIREMENTS. GRANTEES MAY USE THE FUNDS FOR DISASTER RELATED LONG-TERM RECOVERY, RESTORATION OF INFRASTRUCTURE, HOUSING, ECONOMIC REVITALIZATION, AND MITIGATION ACTIVITIES. ALL CDBG-DR AND CDBG-MIT ACTIVITIES MUST CLEARLY ADDRESS A DIRECT OR INDIRECT IMPACT OF THE DISASTER IN A PRESIDENTIALLY DECLARED AREA FOR THE COVERED DISASTER. EACH GRANTEE MUST DEVELOP AN ACTION PLAN THAT OUTLINES HOW THE GRANTEE PLANS TO ALLOCATE FUNDING TO A COMBINATION OF RECOVERY PROGRAMS. EACH GRANTEE MUST MAKE THE DRAFT ACTION PLAN AVAILABLE FOR PUBLIC COMMENT AND FEEDBACK PRIOR TO SUBMITTING THE PLAN TO HUD FOR REVIEW. ONCE APPROVED, THE ACTION PLAN SERVES AS THE BLUEPRINT FOR THE GRANTEE’S CDBG-DR PROGRAM. THE ACTION PLAN PROCESS IS OUTLINED IN THE APPLICABLE ALLOCATION ANNOUNCEMENT NOTICE.; EXPECTED OUTCOMES: CDBG-DR FUNDS ARE EXPECTED TO RESULT IN LONG-TERM DISASTER RECOVERY FOR COMMUNITIES IMPACTED BY PRESIDENTIALLY DECLARED DISASTERS.; INTENDED BENEFICIARIES: CDBG-DR FUNDS ARE INTENDED PRIMARILY FOR LOW- AND MODERATE-INCOME HOUSEHOLDS PER STATUTORY REQUIREMENTS. CDBG-DR IS THE ONLY FEDERAL DISASTER RESOURCE THAT PRIORITIZES LOW- AND MODERATE-INCOME HOUSEHOLDS. LOW- AND MODERATE-INCOME MEANS A FAMILY OR HOUSEHOLD WITH AN ANNUAL INCOME LESS THAN THE SECTION 8 LOW INCOME LIMIT, WHICH IS GENERALLY 80 PERCENT OF THE AREA MEDIAN INCOME. MOST ALLOCATIONS OF CDBG-DR AND CDBG-MIT FUNDS REQUIRE GRANTEES USE 70 PERCENT OF THE GRANT FUNDS TO BENEFIT LOW- AND MODERATE-INCOME PERSONS, HOWEVER GRANTEES MUST REVIEW THE APPLICABLE FEDERAL REGISTER NOTICE GOVERNING THE FUNDS TO CONFIRM THE REQUIREMENTS OF EACH GRANT. OVERALL, CDBG-DR FUNDS SHOULD BE USED TO ASSIST INDIVIDUALS, COMMUNITIES, AND/OR BUSINESSES SITUATED IN THE MOST IMPACTED AND DISTRESSED AREAS AFFECTED BY A PRESIDENTIALLY DECLARED DISASTER.; SUBRECIPIENT ACTIVITIES: THE SUBRECIPIENT ACTIVITIES ARE UNKNOWN AT THE TIME OF AWARD.
Department of Housing and Urban Development
$201.5M
PURPOSE: COMMUNITY DEVELOPMENT BLOCK GRANT DISASTER RECOVERY (CDBG-DR) AND COMMUNITY DEVELOPMENT BLOCK GRANT MITIGATION (CDBG-MIT) GRANT FUNDS ARE APPROPRIATED BY CONGRESS AND ALLOCATED BY THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HUD) AS AUTHORIZED UNDER TITLE I OF THE HOUSING AND COMMUNITY DEVELOPMENT ACT OF 1974, AS AMENDED. THE MAIN PURPOSE OF CDBG-DR FUNDS IS TO REBUILD DISASTER-IMPACTED AREAS AND PROVIDE CRUCIAL SEED MONEY TO START THE LONG-TERM RECOVERY PROCESS. THESE FLEXIBLE GRANTS HELP CITIES, COUNTIES, INDIAN TRIBES, AND STATES RECOVER FROM PRESIDENTIALLY DECLARED DISASTERS, ESPECIALLY IN LOW-INCOME AREAS, SUBJECT TO AVAILABILITY OF SUPPLEMENTAL APPROPRIATIONS. SINCE CDBG-DR ASSISTANCE MAY FUND A BROAD RANGE OF RECOVERY ACTIVITIES, HUD CAN HELP COMMUNITIES AND NEIGHBORHOODS THAT OTHERWISE MIGHT NOT RECOVER DUE TO LIMITED RESOURCES.; ACTIVITIES TO BE PERFORMED: STATE AND LOCAL GOVERNMENTS RECEIVE CDBG-DR AND CDBG-MIT FUNDS FROM HUD TO ASSIST COMMUNITIES RECOVERING FROM A PRESIDENTIALLY DECLARED DISASTER. HUD ALLOCATES FUNDS BASED ON THE UNMET RECOVERY NEEDS OF EACH COMMUNITY. HUD ISSUES AN ALLOCATION ANNOUNCEMENT NOTICE IN THE FEDERAL REGISTER WHICH WILL INCLUDE THE LIST OF GRANTEES, ALLOCATIONS, AND ANY WAIVERS AND ALTERNATIVE REQUIREMENTS. GRANTEES MAY USE THE FUNDS FOR DISASTER RELATED LONG-TERM RECOVERY, RESTORATION OF INFRASTRUCTURE, HOUSING, ECONOMIC REVITALIZATION, AND MITIGATION ACTIVITIES. ALL CDBG-DR AND CDBG-MIT ACTIVITIES MUST CLEARLY ADDRESS A DIRECT OR INDIRECT IMPACT OF THE DISASTER IN A PRESIDENTIALLY DECLARED AREA FOR THE COVERED DISASTER. EACH GRANTEE MUST DEVELOP AN ACTION PLAN THAT OUTLINES HOW THE GRANTEE PLANS TO ALLOCATE FUNDING TO A COMBINATION OF RECOVERY PROGRAMS. EACH GRANTEE MUST MAKE THE DRAFT ACTION PLAN AVAILABLE FOR PUBLIC COMMENT AND FEEDBACK PRIOR TO SUBMITTING THE PLAN TO HUD FOR REVIEW. ONCE APPROVED, THE ACTION PLAN SERVES AS THE BLUEPRINT FOR THE GRANTEE’S CDBG-DR PROGRAM. THE ACTION PLAN PROCESS IS OUTLINED IN THE APPLICABLE ALLOCATION ANNOUNCEMENT NOTICE.; EXPECTED OUTCOMES: CDBG-DR FUNDS ARE EXPECTED TO RESULT IN LONG-TERM DISASTER RECOVERY FOR COMMUNITIES IMPACTED BY PRESIDENTIALLY DECLARED DISASTERS.; INTENDED BENEFICIARIES: CDBG-DR FUNDS ARE INTENDED PRIMARILY FOR LOW- AND MODERATE-INCOME HOUSEHOLDS PER STATUTORY REQUIREMENTS. CDBG-DR IS THE ONLY FEDERAL DISASTER RESOURCE THAT PRIORITIZES LOW- AND MODERATE-INCOME HOUSEHOLDS. LOW- AND MODERATE-INCOME MEANS A FAMILY OR HOUSEHOLD WITH AN ANNUAL INCOME LESS THAN THE SECTION 8 LOW INCOME LIMIT, WHICH IS GENERALLY 80 PERCENT OF THE AREA MEDIAN INCOME. MOST ALLOCATIONS OF CDBG-DR AND CDBG-MIT FUNDS REQUIRE GRANTEES USE 70 PERCENT OF THE GRANT FUNDS TO BENEFIT LOW- AND MODERATE-INCOME PERSONS, HOWEVER GRANTEES MUST REVIEW THE APPLICABLE FEDERAL REGISTER NOTICE GOVERNING THE FUNDS TO CONFIRM THE REQUIREMENTS OF EACH GRANT. OVERALL, CDBG-DR FUNDS SHOULD BE USED TO ASSIST INDIVIDUALS, COMMUNITIES, AND/OR BUSINESSES SITUATED IN THE MOST IMPACTED AND DISTRESSED AREAS AFFECTED BY A PRESIDENTIALLY DECLARED DISASTER.; SUBRECIPIENT ACTIVITIES: THE SUBRECIPIENT ACTIVITIES ARE UNKNOWN AT THE TIME OF AWARD.
Department of Health and Human Services
$23.1M
HEAD START AND EARLY HEAD START PROGRAM
Department of Housing and Urban Development
$23M
NEIGHBORHOOD STABILIZATION PROGRAM (RECOVERY ACT FUNDED)
Department of Education
$19.7M
HIGHER EDUCATION EMERGENCY RELIEF FUND AID TO EDUCATIONAL INSTITUTIONS
Department of Transportation
$16.8M
PURPOSE: RECONSTRUCT TAXIWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 9,500 FEET OF EXISTING PAVED TAXIWAY A, 275 FEET OF THE EXISTING PAVED CONNECTOR TAXIWAY A1, 275 FEET OF THE EXISTING PAVED CONNECTOR TAXIWAY A2, 275 FEET OF THE EXISTING PAVED CONNECTOR TAXIWAY A3, 275 FEET OF THE EXISTING PAVED CONNECTOR TAXIWAY A4, 275 FEET OF THE EXISTING PAVED CONNECTOR TAXIWAY A7, 275 FEET OF THE EXISTING PAVED CONNECTOR TAXIWAY A9, 275 FEET OF THE EXISTING PAVED CONNECTOR TAXIWAY A10, 200 FEET OF THE EXISTING PAVED CONNECTOR TAXIWAY R3, AND 200 FEET OF THE EXISTING PAVED CONNECTOR TAXIWAY R4 THAT HAVE REACHED THE END OF THEIR USEFUL LIVES. THIS GRANTS FUNDS PHASE 2, WHICH CONSISTS OF CONSTRUCTION OF TAXIWAY A AND ASSOCIATED TAXIWAY CONNECTORS NORTH OF RUNWAY 4/22. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SARASOTA, FLORIDA.
Department of Education
$14.7M
HIGHER EDUCATION EMERGENCY RELIEF FUND AID TO STUDENTS
Department of Commerce
$14.6M
THIS PROJECT WILL INCLUDE RESTORING STREAM, SHORELINE, AND FLOODPLAIN HABITAT, WHICH WILL BENEFIT ENDANGERED SMALLTOOTH SAWFISH AND IMPORTANT RECREATIONAL SPECIES SUCH AS RED DRUM. THE PROJECT WAS DESIGNED TO CREATE A FLOODPLAIN THAT IS MORE RESILIENT TO SEA LEVEL RISE AND TO REMOVE UPSTREAM BARRIERS TO LOW-SALINITY HABITAT, WHICH IS IMPORTANT FOR NUMEROUS FISH SPECIES, INCLUDING AS A LOCATION OF SAFE HARBOR DURING TOXIC RED TIDE ALGAL BLOOMS. LOCAL COMMUNITIES SUCH AS THE CITY OF VENICE WILL BENEFIT FROM INCREASED PROTECTION FROM FLOODING AND ENHANCED RECREATIONAL OPPORTUNITIES.
Department of Agriculture
$12.6M
FERTILIZER PRODUCTION EXPANSION PROGRAM 2.0
Department of Transportation
$11.8M
5307 CARES ACT SARASOTA COUNTY AREA TRANSIT UZA 121190; SARASOTA/BRADENTON FL
Department of Transportation
$11M
THIS IS FFY 2021 ARP OF 2021 SECTION 5307 URBANIZED AREA APPLICATION IN THE AMOUNT OF $11049741.PURPOSE: THE PURPOSE OF THIS AWARD IS TO PROVIDE 2 YEARS OF OPERATING ASSISTANCE TO SARASOTA COUNTY AREA TRANSIT TO ASSIST IT IN RECOVERING FROM COVID-19. THE SARASOTA-BRADENTON URBANIZED AREA METROPOLITAN PLANNING ORGANIZATION RESOLUTION 83-412 DATED 11/14/1983 IS ATTACHED IN TRAMS AND PROVIDES THE SPLIT AGREEMENT OF AN EQUAL SPLIT BETWEEN MANATEE COUNTY AND SARASOTA COUNTY.ACTIVITIES TO BE PERFORMED: FUNDS WILL BE USED TO COVER ALL ELIGIBLE OPERATING EXPENSES SUCH AS DRIVER AND MECHANIC SALARIES FUEL MAINTENANCE ITEMS HAVING A USEFUL LIFE OF LESS THAN ONE YEAR INCLUDING PERSONAL PROTECTIVE EQUIPMENT CLEANING SUPPLIES AND CLEANING SERVICES PROVIDED BY A THIRD PARTY CONTRACTOR IN ORDER TO CONTINUE TRANSIT OPERATIONS. IN ADDITION TO SCAT PROVIDING THE FIXED ROUTE SERVICES A THIRD PARTY CONTRACTOR IS PROVIDING FIXED ROUTE OPERATIONS OF TROLLEYS UNDER SCATS ADMINISTRATION IN THE SIESTA KEY BEACH AREA WHICH IS A CONGESTED LOCATION IN SCAT SERVICE AREA. THIS ENABLES TRAFFIC AND PARKING TO BE RELIEVED ALONG THE POPULAR SIESTA KEY ROUTE. THE COVID-19 HAS ADVERSELY AFFECTED THE AVAILABILITY OF SCATS BUS OPERATORS AS A RESULT SCAT HAS HAD TO SUSPEND FIXED ROUTE SERVICE IN CERTAIN AREAS OF THE COUNTY. GIVEN THE NEED TO REPLACE THE FIXED ROUTE SERVICE SCAT HAS CONTRACTED WITH A THIRD PARTY TO PERFORM ON-DEMAND SERVICES TO THE PUBLIC TO PROVIDE TRIPS THAT ARE CRUCIAL FOR CITIZENS TO ACCESS LIFE SUSTAINING ACTIVITIES IN THOSE AREAS OF THE COUNTY WHERE THE FIXED ROUTE SERVICE HAS BEEN SUSPENDED. ADA/PARATRANSIT SERVICE IS PROVIDED BY THE 3RD PARTY CONTRACTOR. EXPECTED OUTCOMES: FUNDING WILL PERMIT SARASOTA COUNTY AREA TRANSIT TO CONTINUE TO PROVIDE OPERATIONS THAT WOULD OTHERWISE HAVE TO BE CUT DUE TO LACK OF FUNDING. INTENDED BENEFICIARIES: SARASOTA COUNTY AREA TRANSIT AND THE RIDERS THAT RELY ON ITS SERVICE WILL BENEFIT FROM CONTINUED SERVICES PERMITTING WORKERS TO GET TO WORK AND RIDERS TO GET TO ESSENTIAL SERVICES. SUBRECIPIENTS: NONE SARASOTA COUNTY TRANSPORTATION AUTHORITY (SCTA) UNDERSTANDS THAT THE EXPENSES REQUESTED IN THIS APPLICATION ARE SUBJECT TO REVIEW FOR THEIR REASONABLENESS AS PART OF THE AGENCYS NEXT TRIENNIAL/STATE MANAGEMENT REVIEW.OTHER FEDERAL FUNDING STATEMENT: SCTA HAS NOT RECEIVED ANY OTHER FEDERAL FUNDING TO REIMBURSE THE TRANSIT RELATED EXPENSES CONTAINED IN THIS APPLICATION.THE RECIPIENT AGREES THAT IF IT RECEIVES FEDERAL FUNDING FROM THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) OR THROUGH A PASS-THROUGH ENTITY THROUGH THE ROBERT T. STAFFORD DISASTER RELIEF AND EMERGENCY ASSISTANCE ACT A DIFFERENT FEDERAL AGENCY OR INSURANCE PROCEEDS FOR ANY PORTION OF A PROJECT ACTIVITY APPROVED FOR FTA FUNDING UNDER THIS GRANT AGREEMENT IT WILL PROVIDE WRITTEN NOTIFICATION TO FTA AND REIMBURSE FTA FOR ANY FEDERAL SHARE THAT DUPLICATES FUNDING PROVIDED BY FEMA ANOTHER FEDERAL AGENCY OR AN INSURANCE COMPANY.INSURANCE STATEMENT:SCTA HAS NOT RECEIVED NOR FILED ANY INSURANCE CLAIMS FOR EXPENSES IN THIS APPLICATION.USEFUL LIFE:IF AN ITEM OR CONSTRUCTION ELEMENT NOT PREVIOUSLY IDENTIFIED IS PURCHASED OR BUILT WITH THESE FUNDS WHICH HAS A UNIT COST OVER $5000 A BUDGET REVISION WILL BE SUBMITTED TO IDENTIFY THE ITEM OR ELEMENT AND PROVIDE ITS USEFUL LIFE.THIRD PARTY CONTRACTOR STATEMENT: SCTA WILL FOLLOW ALL 3RD PARTY PROCUREMENT POLICIES AS DEFINED IN C4220.1F (THIRD PARTY CONTRACTING GUIDANCE) AND ANY WAIVERS ISSUED EITHER BY OMB OR FTA THAT PERTAIN TO UTILIZATION OF THESE FUND.SCTA WILL ENSURE CONTRACTORS PROCURED WILL NOT BE ON THE FEDERAL SUSPENSION AND DEBARMENT LIST.THIS PROJECT ONLY INCLUDES EMERGENCY OPERATIONS AND EMERGENCY PROTECTIVE MEASURES WITH NO FUNCTIONAL LOCATION OR CAPACITY CHANGE. THEREFORE NO TIP/STIP DOCUMENTATION IS NEEDED PER EMERGENCY RELIEF PROGRAM REQUIREMENTS. PROJECT MANAGEMENT AND FORCE ACCOUNT PLANS DO NOT APPLY UNDER THIS GRANT APPLICATION. OUR ORGANIZATION WILL NOT EXPEND AT LEAST 1% OF THE 5307 ARP FUNDS FOR SECURITY-RELATED PROJECTS; HOWEVER 1% SECURITY WILL BE EXPENDED WITH THE 5307 GRANTS.
Department of Transportation
$10M
PURPOSE: EXPAND TERMINAL BUILDING. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXPANDS THE EXISTING TERMINAL BUILDING AN ADDITIONAL 72,090 SQUARE FEET TO INCREASE THE AIRPORT'S CAPACITY TO MEET THE OPERATIONAL NEEDS OF THE AIRPORT. . THIS GRANT FUNDS THE FIFTH PHASE, WHICH CONSISTS OF CONSTRUCTION OF APPROXIMATELY 18,800 SQUARE FEET OF THE TERMINAL EXPANSION. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SARASOTA, FLORIDA.
Department of Transportation
$10M
PURPOSE: EXPAND TERMINAL BUILDING. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXPANDS THE EXISTING TERMINAL BUILDING AN ADDITIONAL 72,090 SQUARE FEET TO INCREASE THE AIRPORT'S CAPACITY TO MEET THE OPERATIONAL NEEDS OF THE AIRPORT. . THIS GRANT FUNDS THE FIRST PHASE, WHICH CONSISTS OF UTILITY RELOCATION. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SARASOTA, FLORIDA.
Department of Transportation
$9.9M
PURPOSE: EXPAND TERMINAL BUILDING. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXPANDS THE EXISTING TERMINAL BUILDING AN ADDITIONAL 72,090 SQUARE FEET TO INCREASE THE AIRPORT'S CAPACITY TO MEET THE OPERATIONAL NEEDS OF THE AIRPORT. . THIS GRANT FUNDS THE FOURTH PHASE, WHICH CONSISTS OF CONSTRUCTING APPROXIMATELY 18,500 SQUARE FEET OF THE TERMINAL EXPANSION. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SARASOTA, FLORIDA.
Department of Transportation
$8.8M
PURPOSE: AMERICAN RESCUE PLAN ACT AWARDED AS ECONOMIC ASSISTANCE TO ELIGIBLE U.S. AIRPORTS AND ELIGIBLE CONCESSIONS AT THOSE AIRPORTS TO PREVENT, PREPARE FOR, AND RESPOND TO THE COVID-19 PANDEMIC. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS GRANT PROVIDES ECONOMIC RELIEF FUNDS FOR COSTS RELATED TO OPERATIONS, PERSONNEL, CLEANING, SANITIZATION, JANITORIAL SERVICES, DEBT SERVICE PAYMENTS, AND COMBATING THE SPREAD OF PATHOGENS AT THE AIRPORT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SARASOTA, FLORIDA.
Department of Transportation
$8.6M
APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO PROVIDE CAPITAL AND OPERATING ASSISTANCE TO SARASOTA COUNTY TRANSIT.; ACTIVITIES PERFORMED: ADA/PARATRANSIT SERVICE IS PROVIDED BY THE 3RD PARTY CONTRACTOR TROLLEY SERVICE PROVIDED A 3RD PARTY CONTRACTOR PLANNING AND SAFETY SECURITY ENHANCEMENT; EXPECTED OUTCOMES: FUNDING WILL PERMIT SARASOTA COUNTY TRANSIT TO CONTINUE TO PROVIDE OPERATIONS THAT WOULD OTHERWISE HAVE TO BE CUT DUE TO LACK OF FUNDING.; INTENDED BENEFICIARIES: SARASOTA COUNTY TRANSIT AND THE RIDERS THAT RELY ON ITS SERVICE WILL BENEFIT FROM CONTINUED SERVICES PERMITTING WORKERS TO GET TO WORK AND RIDERS TO GET TO ESSENTIAL SERVICES.; SUBRECIPIENT ACTIVITIES: NONE
Department of Transportation
$7.9M
APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO PROVIDE CAPITAL AND OPERATING ASSISTANCE TO SARASOTA COUNTY TRANSIT.; ACTIVITIES PERFORMED: ADA/PARATRANSIT SERVICE IS PROVIDED BY THE 3RD PARTY CONTRACTORTROLLEY SERVICE PROVIDED A 3RD PARTY CONTRACTORPLANNING AND SAFETY SECURITY ENHANCEMENTCONSTRUCTION AND PURCHASE OF BUS SHELTERSBUY 35-FT REPLACEMENT BUSES:SARASOTA COUNTY TRANSIT WILL REPLACE ONE 2016 AND ONE 2017 35-FOOT LOW FLOOR GILLIG BUSES WITH NEW 35-FOOT LOW FLOOR GILLIG BUSES. THE FTA USEFUL LIFE FOR A 35-FOOT LOW FLOOR GILLIG BUS IS 12 YEARS OR 500000 MILES. THE 2016 AND 2017 LOW FLOOR GILLIG BUSES WILL HAVE MET THEIR USEFUL LIFE BASED ON ACCUMULATED MILES SINCE THEY WILL HAVE 500000 OR MORE MILES ON THEM AT THE TIME OF THEIR REPLACEMENT. ALL REPLACEMENT VEHICLES WILL HAVE THE SAME USEFUL LIFE AS THE VEHICLES TO BE REPLACED.** IT IS SARASOTA COUNTY TRANSITS INTENT TO SPREAD THE REPLACEMENT OF THE EXISTING FIXED ROUTE FLEET OVER A FIVE-YEAR PERIOD BEGINNING WITH ORDERING EIGHT REPLACEMENT BUSES IN FY23 WITH A PROJECTED DELIVERY IN FY24. IN ADDITION TO AVOID AN AGGREGATION OF ONE MODEL YEAR IN THE FIXED ROUTE FLEET SARASOTA COUNTY TRANSIT WILL NOT PURCHASE MORE THAN NINE REPLACEMENT BUSES IN ANY FISCAL YEAR. THEREFORE THE FIXED ROUTE FLEET REPLACEMENT PLAN ASSUMES THE PURCHASE OF EIGHT BUSES IN FY23 NINE BUSES IN FY24 FY25 AND FY26 AND FOUR BUSES IN FY27. PLEASE REFER TO THE UPLOADED FLEET STATUS TO SEE THE BUSES THAT WILL CONTINUE TO BE IN SERVICE AND WILL NOT BE REPLACED UNTIL THEY MEET FTAS USEFUL LIFE AND MILEAGE REQUIREMENT. THE MILES TRAVELED FOR FIXED FLEET BUSES AVERAGE APPROXIMATELY 55600 MILES PER YEAR. FURTHERMORE THE REPLACEMENT BUSES WILL BE ORDERED WITHIN THE EXPECTED ARRIVAL OF THE NEW BUS TO BE AT SUCH TIME THE BUSES TO BE REPLACED WILL HAVE MET THE FTAS USEFUL LIFE STANDARD. THE BUSES TO BE REPLACED ARE PROJECTED TO COST APPROXIMATELY $740000 PER BUS (INCLUDES A PROJECTED 6% ANNUAL INCREASE IN THE $712000 ACTUAL COST FOR THE BUSES ORDERED IN FY2024) AT THE TIME OF REPLACEMENT WHICH IS SUBJECT TO CHANGE DUE ECONOMIC CONDITIONS.YEAR /MAKE/ TYPE/ DATE IN SERVICE / VIN / MILEAGE/ MILEAGE DATE/PROJECTED FUNDING/PROJECTED RETIREMENT MILES/PROJECT FY RETIRED 2016GILLIGCD / LOW FLOOR7/28/1615GGB2712G1187080478865 2/25/2025 $100000 590445 FY272017GILLIGCD / LOW FLOOR6/13/1715GGB2719H1189961445265 2/25/2025 $100000 560793 FY27; EXPECTED OUTCOMES: FUNDING WILL PERMIT SARASOTA COUNTY TRANSIT TO CONTINUE TO PROVIDE OPERATIONS THAT WOULD OTHERWISE HAVE TO BE CUT DUE TO LACK OF FUNDING.; INTENDED BENEFICIARIES: SARASOTA COUNTY TRANSIT AND THE RIDERS THAT RELY ON ITS SERVICE WILL BENEFIT FROM CONTINUED SERVICES PERMITTING WORKERS TO GET TO WORK AND RIDERS TO GET TO ESSENTIAL SERVICES.; SUBRECIPIENT ACTIVITIES: NONE
Department of Housing and Urban Development
$7.1M
NEIGHBORHOOD STABILIZATION PRG
Department of Transportation
$6.5M
PURPOSE: EXPAND TERMINAL. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXPANDS THE EXISTING TERMINAL BY 72,090 SQUARE FEET, INCLUDING EXISTING CONCOURSE B UPGRADES. THE EXPANSION WILL ACCOMMODATE MORE PASSENGERS. THIS GRANT FUNDS PHASE 9, WHICH CONSISTS OF CHILLER LINE UPGRADES, POWER AND ELECTRICAL WORK, STAIRS, GREASE TRAPS, AND CURBSIDE IMPROVEMENTS. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SARASOTA, FLORIDA.
Department of Transportation
$6.3M
IMPROVE EXISTING AIRPORT IMPROVE AIRPORT DRAINAGE; EAST AIRFIELD
Department of Transportation
$6.2M
PURPOSE: EXPAND TERMINAL. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXPANDS THE EXISTING TERMINAL BY 72,090 SQUARE FEET. THIS GRANT FUNDS THE GROUND BOARDING FACILITY. THE EXPANSION WILL REDUCE DELAYS, ACCOMMODATE MORE PASSENGER, AND ADDITIONAL AIRCRAFT OPERATIONS. THIS GRANT FUNDS PHASE 8, WHICH CONSISTS OF CONSTRUCTING APPROXIMATELY 11,750 SQUARE FEET OF THE TERMINAL EXPANSION. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SARASOTA, FLORIDA.
Department of Transportation
$6.2M
PURPOSE: EXPAND APRON. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXPANDS THE EXISTING TERMINAL APRON AN ADDITIONAL 19,300 SQUARE YARDS TO ACCOMMODATE INCREASED USE OF THE GENERAL AVIATION FACILITIES. THIS GRANT FUNDS THE DESIGN AND THE FIRST PHASE OF CONSTRUCTION WHICH CONSISTS OF 13,700 SQUARE YARDS OF APRON. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SARASOTA, FLORIDA.
Environmental Protection Agency
$5.8M
A GRANT AGREEMENT IS PROVIDED TO ASSIST THE SARATOGA COUNTY PLANNING BOARD WITH THE COMPLETION OF COUNTY WATER SUPPLY MASTER PLAN, COST EVALUATION AN
Department of Transportation
$5.4M
PURPOSE: REHABILITATE TAXIWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT REHABILITATES 1,950 FEET OF THE EXISTING TAXIWAY F PAVEMENT TO EXTEND ITS USEFUL LIFE. THIS PROJECT REHABILITATES 7,540 FEET OF THE EXISTING TAXIWAY C PAVEMENT TO EXTEND ITS USEFUL LIFE. THIS GRANT FUNDS THE FINAL PHASE, WHICH CONSISTS OF CONSTRUCTION. THIS GRANT FUNDS THE FINAL PHASE, WHICH CONSISTS OF CONSTRUCTION. . INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SARASOTA, FLORIDA.
Department of Transportation
$5.4M
APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO PROVIDE CAPITAL AND OPERATING ASSISTANCE TO SARASOTA COUNTY AREA TRANSIT.; ACTIVITIES PERFORMED: ADA/PARATRANSIT SERVICE IS PROVIDED BY THE 3RD PARTY CONTRACTORTROLLEY SERVICE PROVIDED A 3RD PARTY CONTRACTORPLANNING AND SAFETY SECURITY ENHANCEMENTCONSTRUCTION AND PURCHASE OF BUS SHELTERSBUY 35-FT REPLACEMENT BUSES:SARASOTA COUNTY TRANSIT WILL REPLACE 2016 35-FOOT LOW FLOOR GILLIG BUSES WITH NEW 35-FOOT LOW FLOOR GILLIG BUSES. THE FTA USEFUL LIFE FOR A 35-FOOT LOW FLOOR GILLIG BUS IS 12 YEARS OR 500000 MILES. THE 2016 LOW FLOOR GILLIG BUSES WILL HAVE MET THEIR USEFUL LIFE BASED ON ACCUMULATED MILES SINCE THEY WILL HAVE 500000 OR MORE MILES ON THEM AT THE TIME OF THEIR REPLACEMENT. ALL REPLACEMENT VEHICLES WILL HAVE THE SAME USEFUL LIFE AS THE VEHICLES TO BE REPLACED.** IT IS SARASOTA COUNTY TRANSITS INTENT TO SPREAD THE REPLACEMENT OF THE EXISTING FIXED ROUTE FLEET OVER A FIVE-YEAR PERIOD BEGINNING WITH ORDERING EIGHT REPLACEMENT BUSES IN FY23 WITH A PROJECTED DELIVERY IN FY24. IN ADDITION TO AVOID AN AGGREGATION OF ONE MODEL YEAR IN THE FIXED ROUTE FLEET SARASOTA COUNTY TRANSIT WILL NOT PURCHASE MORE THAN NINE REPLACEMENT BUSES IN ANY FISCAL YEAR. THEREFORE THE FIXED ROUTE FLEET REPLACEMENT PLAN ASSUMES THE PURCHASE OF EIGHT BUSES IN FY23 NINE BUSES IN FY24 FY25 AND FY26 AND FOUR BUSES IN FY27. PLEASE REFER TO THE UPLOADED FLEET STATUS TO SEE THE BUSES THAT WILL CONTINUE TO BE IN SERVICE AND WILL NOT BE REPLACED UNTIL THEY MEET FTAS USEFUL LIFE AND MILEAGE REQUIREMENT. THE MILES TRAVELED FOR FIXED FLEET BUSES AVERAGE APPROXIMATELY 55600 MILES PER YEAR. FURTHERMORE THE REPLACEMENT BUSES WILL BE ORDERED WITHIN THE EXPECTED ARRIVAL OF THE NEW BUS TO BE AT SUCH TIME THE BUSES TO BE REPLACED WILL HAVE MET THE FTAS USEFUL LIFE STANDARD. THE BUSES TO BE REPLACED ARE PROJECTED TO COST APPROXIMATELY $695000 PER BUS (INCLUDES A PROJECTED 6% ANNUAL INCREASE IN THE $620000 ACTUAL COST FOR THE BUSES ORDERED IN FY2023) AT THE TIME OF REPLACEMENT WHICH IS SUBJECT TO CHANGE DUE ECONOMIC CONDITIONS.YEAR /MAKE/ TYPE/ DATE IN SERVICE / VIN / MILEAGE/ MILEAGE DATE/PROJECTED FUNDING/PROJECTED RETIREMENT MILES/PROJECT FY RETIRED 2016GILLIGCD / LOW FLOOR7/28/1615GGB2710G1187075383664 7/31/2023 $644704 520687 FY262016GILLIGCD / LOW FLOOR7/28/1615GGB2712G1187077408087 7/31/2023 $695000 553832 FY262016GILLIGCD / LOW FLOOR7/28/1615GGB2714G1187078405741 7/31/2023 $695000 550649 FY262016GILLIGCD / LOW FLOOR7/28/1615GGB2716G1187079406175 7/31/2023 $695000 551238 FY262016GILLIGCD / LOW FLOOR7/28/1615GGB2712G1187080388032 7/31/2023 $128706 582048 FY272016GILLIGCD / LOW FLOOR7/28/1615GGB2714G1187081391913 7/31/2023 $695000 531883 FY26; EXPECTED OUTCOMES: FUNDING WILL PERMIT SARASOTA COUNTY TRANSIT TO CONTINUE TO PROVIDE OPERATIONS THAT WOULD OTHERWISE HAVE TO BE CUT DUE TO LACK OF FUNDING.; INTENDED BENEFICIARIES: SARASOTA COUNTY TRANSIT AND THE RIDERS THAT RELY ON ITS SERVICE WILL BENEFIT FROM CONTINUED SERVICES PERMITTING WORKERS TO GET TO WORK AND RIDERS TO GET TO ESSENTIAL SERVICES.; SUBRECIPIENT ACTIVITIES: NONE
Department of Transportation
$5.3M
APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO PROVIDE CAPITAL ASSISTANCE TO SARASOTA COUNTY AREA TRANSIT.; ACTIVITIES PERFORMED: ADA/PARATRANSIT SERVICE IS PROVIDED BY THE 3RD PARTY CONTRACTOR. BUY 35-FT REPLACEMENT BUSES PLANNING AND SAFETY SECURITY ENHANCEMENT.; EXPECTED OUTCOMES: FUNDING WILL PERMIT SARASOTA COUNTY AREA TRANSIT TO CONTINUE TO PROVIDE OPERATIONS THAT WOULD OTHERWISE HAVE TO BE CUT DUE TO LACK OF FUNDING.; INTENDED BENEFICIARIES: SARASOTA COUNTY AREA TRANSIT AND THE RIDERS THAT RELY ON ITS SERVICE WILL BENEFIT FROM CONTINUED SERVICES PERMITTING WORKERS TO GET TO WORK AND RIDERS TO GET TO ESSENTIAL SERVICES.; SUBRECIPIENT ACTIVITIES: NONE
Department of Transportation
$5.1M
PURPOSE: CONSTRUCT TAXIWAY; INSTALL PERIMETER FENCING NOT REQUIRED BY 49 CFR 1542. THIS GRANT INCLUDES FUNDING BY THE AMERICAN RESCUE PLAN ACT OF 2021 TO INCREASE THE FEDERAL SHARE TO 100 PERCENT FOR THE AIRPORT IMPROVEMENT PROGRAM (AIP). ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT CONSTRUCTS A NEW 1,700 FOOT PARTIAL PARALLEL TAXIWAY A TO ELIMINATE THE NEED FOR AIRCRAFT TO BACK-TAXI ON THE RUNWAY. THIS PROJECT INSTALLS 26,000 FEET OF WILDLIFE PERIMETER FENCING TO ENHANCE SAFE AIRFIELD OPERATIONS BY MITIGATING WILDLIFE HAZARDS. THIS PROJECT IS IN A FEDERAL AVIATION ADMINISTRATION APPROVED WILDLIFE HAZARD ASSESSMENT. THIS GRANT FUNDS THE FINAL PHASE, WHICH CONSISTS OF CONSTRUCTION. THIS GRANT FUNDS THE FINAL PHASE, WHICH CONSISTS OF ENVIRONMENTAL MITIGATION. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SARATOGA SPRINGS, NEW YORK.
Department of Energy
$5M
RECOVERY ACT: SARASOTA COUNUTY ENERGY EFFICIENT PROJECT
Department of Transportation
$5M
PURPOSE: EXPAND TERMINAL. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXPANDS THE EXISTING TERMINAL BY 72,090 SQUARE FEET. THIS GRANTS FUNDS THE EXISTING CONCOURSE B UPGRADES. THE EXPANSION WILL REDUCE DELAYS, ACCOMMODATE MORE PASSENGERS, AND ACCOMMODATE MORE AIRCRAFT OPERATIONS. THIS GRANT FUNDS PHASE 10, WHICH CONSISTS OF TERMINAL CONCOURSE B RENOVATIONS (WORK PACKAGE 6B). INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SARASOTA, FLORIDA.
Department of Transportation
$4.9M
PROJECT TITLE: MANASOTA KEY BASCULE BRIDGE - REHABILITATION AND STORM HARDENING :::: PROJECT DESCRIPTION: MANASOTA KEY BASCULE BRIDGE - REHABILITATION AND STORM HARDENING
Department of Transportation
$4.6M
PURPOSE: EXPAND TERMINAL. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXPANDS THE EXISTING TERMINAL BY 72,090 SQUARE FEET. THIS GRANTS FUNDS THE GROUND BOARDING FACILITY. THE EXPANSION WILL REDUCE DELAYS, ACCOMMODATE MORE PASSENGERS, AND ACCOMMODATE MORE AIRCRAFT OPERATIONS. THIS GRANT FUNDS PHASE 9, WHICH CONSISTS OF CONSTRUCTING APPROXIMATELY 8,440 SQUARE FEET OF THE TERMINAL EXPANSION. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SARASOTA, FLORIDA.
Department of Health and Human Services
$4.5M
CHILD MENTAL HEALTH INITIATIVE
Environmental Protection Agency
$4.3M
THIS ACTION APPROVES AN AWARD IN THE AMOUNT OF $828 500 TO THE SARASOTA BAY ESTUARY PROGRAM TO DEVELOP AND IMPLEMENT THE COMPREHENSIVE CONSERVATION A
Department of Transportation
$4.2M
PURPOSE: EXPAND TERMINAL BUILDING. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXPANDS THE EXISTING TERMINAL BUILDING AN ADDITIONAL 72,090 SQUARE FEET TO INCREASE THE AIRPORT'S CAPACITY TO MEET THE OPERATIONAL NEEDS OF THE AIRPORT. . THIS GRANT FUNDS THE FOURTH PHASE, WHICH CONSISTS OF CONSTRUCTION OF APPROXIMATELY 7,950 SQUARE FEET OF THE TERMINAL EXPANSION. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SARASOTA, FLORIDA.
Department of Transportation
$4.2M
FY20 5307 URBANIZED AREA FORMULA GRANT; SCTA; SARASOTA-BRADENTON UZA FL
Department of Homeland Security
$4.2M
STAFFING FOR ADEQUATE FIRE AND EMERGENCY RESPONSE (SAFER)
Department of Transportation
$4.1M
FFY19 5307 URBANIZED AREA FORMULA GRANT; SCTA; SARASOTA-BRADENTON FL
Department of Transportation
$4.1M
THIS IS THE FTA FFY 2021 5307 URBANIZED AREA FORMULA GRANT APPLICATION FOR THE SARASOTA TRANSPORTATION AUTHORITY (SCTA). FY 2019 APPORTIONMENT FOR THE SARASOTA-BRADENTON FL URBANIZED AREA #0061 IS $8251478. THE TOTAL PROJECT FUNDS BEING PROVIDED TO SCTA ARE $4125739.THE SARASOTA-BRADENTON URBANIZED AREA METROPOLITAN PLANNING ORGANIZATION RESOLUTION 83-412 DATED 11/14/1983 IS ATTACHED IN TRAMS AND PROVIDES THE SPLIT AGREEMENT OF AN EQUAL SPLIT BETWEEN MANATEE COUNTY AND SARASOTA COUNTY.PURPOSE: THE PURPOSE OF THIS AWARD IS TO PROVIDE CAPITAL ASSISTANCE AND ONE YEAR OF OPERATING ASSISTANCE TO SARASOTA COUNTY AREA TRANSIT. ACTIVITIES TO BE PERFORMED: FUNDS WILL BE USED TO COVER ALL ELIGIBLE OPERATING EXPENSES SUCH AS DRIVER AND MECHANIC SALARIES FUEL MAINTENANCE ITEMS HAVING A USEFUL LIFE OF LESS THAN ONE YEAR INCLUDING PERSONAL PROTECTIVE EQUIPMENT CLEANING SUPPLIES AND CLEANING SERVICES PROVIDED BY A THIRD PARTY CONTRACTOR IN ORDER TO CONTINUE TRANSIT OPERATIONS. IN ADDITION TO SCAT PROVIDING THE FIXED ROUTE SERVICES A THIRD PARTY CONTRACTOR IS PROVIDING FIXED ROUTE OPERATIONS OF TROLLEYS UNDER SCATS ADMINISTRATION IN THE SIESTA KEY BEACH AREA WHICH IS A CONGESTED LOCATION IN SCAT SERVICE AREA. THIS ENABLES TRAFFIC AND PARKING TO BE RELIEVED ALONG THE POPULAR SIESTA KEY ROUTE. ADA/PARATRANSIT SERVICE IS PROVIDED BY THE 3RD PARTY CONTRACTOR. BUY 35-FT REPLACEMENT BUSESPLANNINGCONSTRUCTION OF THE BUS SHELTERSPREVENTATIVE MAINTENANCE.SCAT WILL REPLACE THREE 2014 35-FOOT LOW FLOOR GILLIG BUSES WITH NEW 35-FOOT LOW FLOOR GILLIG BUSES. THE FTA USEFUL LIFE FOR A 35-FOOT LOW FLOOR GILLIG BUS IS 12 YEARS OR 500000 MILES. THE 2014 LOW FLOOR GILLIG BUSES WILL HAVE MET THEIR USEFUL LIFE BASED ON ACCUMULATED MILES SINCE THEY WILL HAVE 500000 OR MORE MILES ON THEM AT THE TIME OF THEIR REPLACEMENT. ALL REPLACEMENT VEHICLES WILL HAVE THE SAME USEFUL LIFE AS THE VEHICLES TO BE REPLACED.THE FOLLOWING THREE VEHICLES WILL BE REPLACED:YEAR IN SERV. / MAKE / VIN / MILEAGE AS OF 3/31/20222014 / GILLIG / 15GGB2710E11839324459012014 / GILLIG / 15GGB271XE11839404441072014 / GILLIG /15GGB2717E1183944439946 EXPECTED OUTCOMES: FUNDING WILL PERMIT SARASOTA COUNTY AREA TRANSIT TO CONTINUE TO PROVIDE OPERATIONS THAT WOULD OTHERWISE HAVE TO BE CUT DUE TO LACK OF FUNDING. INTENDED BENEFICIARIES: SARASOTA COUNTY AREA TRANSIT AND THE RIDERS THAT RELY ON ITS SERVICE WILL BENEFIT FROM CONTINUED SERVICES PERMITTING WORKERS TO GET TO WORK AND RIDERS TO GET TO ESSENTIAL SERVICES. SUBRECIPIENTS: NONE SARASOTA COUNTY TRANSPORTATION AUTHORITY (SCTA) UNDERSTANDS THAT THE EXPENSES REQUESTED IN THIS APPLICATION ARE SUBJECT TO REVIEW FOR THEIR REASONABLENESS AS PART OF THE AGENCYS NEXT TRIENNIAL/STATE MANAGEMENT REVIEW.OTHER FEDERAL FUNDING STATEMENT: SCTA HAS NOT RECEIVED ANY OTHER FEDERAL FUNDING TO REIMBURSE THE TRANSIT RELATED EXPENSES CONTAINED IN THIS APPLICATION.THE RECIPIENT AGREES THAT IF IT RECEIVES FEDERAL FUNDING FROM THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) OR THROUGH A PASS-THROUGH ENTITY THROUGH THE ROBERT T. STAFFORD DISASTER RELIEF AND EMERGENCY ASSISTANCE ACT A DIFFERENT FEDERAL AGENCY OR INSURANCE PROCEEDS FOR ANY PORTION OF A PROJECT ACTIVITY APPROVED FOR FTA FUNDING UNDER THIS GRANT AGREEMENT IT WILL PROVIDE WRITTEN NOTIFICATION TO FTA AND REIMBURSE FTA FOR ANY FEDERAL SHARE THAT DUPLICATES FUNDING PROVIDED BY FEMA ANOTHER FEDERAL AGENCY OR AN INSURANCE COMPANY.INSURANCE STATEMENT:SCTA HAS NOT RECEIVED NOR FILED ANY INSURANCE CLAIMS FOR EXPENSES IN THIS APPLICATION.USEFUL LIFE:IF AN ITEM OR CONSTRUCTION ELEMENT NOT PREVIOUSLY IDENTIFIED IS PURCHASED OR BUILT WITH THESE FUNDS WHICH HAS A UNIT COST OVER $5000 A BUDGET REVISION WILL BE SUBMITTED TO IDENTIFY THE ITEM OR ELEMENT AND PROVIDE ITS USEFUL LIFE.THIRD PARTY CONTRACTOR STATEMENT: SCTA WILL FOLLOW ALL 3RD PARTY PROCUREMENT POLICIES AS DEFINED IN C4220.1F (THIRD PARTY CONTRACTING GUIDANCE) AND ANY WAIVERS ISSUED EITHER BY OMB OR FTA THAT PERTAIN TO UTILIZATION OF THESE FUND.SCTA WILL ENSURE CONTRACTORS PROCURED WILL NOT BE ON THE FEDERAL SUSPENSION AND DEBARMENT LIST.PROJECT MANAGEMENT AND FORCE ACCOUNT PLANS DO NOT APPLY UNDER THIS GRANT APPLICATION.
Department of Transportation
$4.1M
5307 FUNDS CAPITAL OPERATIONS PLANNING; SCAT SARASOTA-BRADENTON UZA FL
Department of Transportation
$4M
FY 2017 5307 URBANIZED AREA FORMULA GRANT SARASOTA-BRADENTON FL
Department of Housing and Urban Development
$3.9M
COMMUNITY DEVELOPMENT BLOCK GRANTS/ENTITLEMENT GRANTS
Source: Federal Audit Clearinghouse (fac.gov)
Years audited
6
Clean years
6
Material Weakness
No
Noncompliance Issues
No
| Year | Status | Financial Report | Federal Expenditurecombined across all audits filed that year | Low Risk | Accepted |
|---|---|---|---|---|---|
| 2025 | Clean | Unmodified (Clean) | $1.2M | Yes | 2026-09-09 |
| 2024 | Clean | Unmodified (Clean) | $860.5K | Yes | 2025-08-10 |
| 2023 | Clean | Unmodified (Clean) | $843.2K | Yes | 2024-09-18 |
| 2022 | Clean | Unmodified (Clean) | $1.2M | Yes | 2023-08-21 |
| 2021 | Clean | Unmodified (Clean) | $1M | No | 2022-07-27 |
| 2020 | Clean | Unmodified (Clean) | $943.3K | No | 2021-08-10 |
Financial Report
Unmodified (Clean)
Federal Expenditure, combined across all audits filed that year
$1.2M
Financial Report
Unmodified (Clean)
Federal Expenditure, combined across all audits filed that year
$860.5K
Financial Report
Unmodified (Clean)
Federal Expenditure, combined across all audits filed that year
$843.2K
Financial Report
Unmodified (Clean)
Federal Expenditure, combined across all audits filed that year
$1.2M
Financial Report
Unmodified (Clean)
Federal Expenditure, combined across all audits filed that year
$1M
Financial Report
Unmodified (Clean)
Federal Expenditure, combined across all audits filed that year
$943.3K
Tax Year 2024 · Source: IRS e-Filed Form 990
Individuals serving as officers, directors, or trustees of the organization.
| Name | Title | Hrs/Wk | Compensation | Related Orgs | Other |
|---|
Source: IRS Publication 78, Auto-Revocation List & e-Postcard Data
Tax-deductible contributions: Yes
Deductibility code: PC
Sources: IRS e-Filed Form 990 (XML) & ProPublica Nonprofit Explorer
Scroll →
| Year | Revenue | Contributions | Expenses | Assets | Net Assets |
|---|---|---|---|---|---|
| 2024IRS e-File | $1.7M | $1.6M | $1.2M | $1.8M | $1.7M |
| 2023 | $1.5M | $1.5M | $1.4M | $1.3M | $1.2M |
| 2022 | $1.5M | $1.5M | $1.4M | $1.2M | $1.2M |
| 2021 | $1.3M | $1.3M | $1.2M |
Sources: ProPublica Nonprofit Explorer & IRS e-File Index
Financial data: IRS e-Filed Form 990 (Tax Year 2024)
Leadership & compensation: IRS e-Filed Form 990, Part VII (Tax Year 2024)
Federal grants: USAspending.gov (live)
Organization info: IRS Business Master File
Tax-deductibility: IRS Publication 78
| Total |
|---|
| Joan Blossom | Director, Secretary | 2 | $0 | $0 | $0 | $0 |
| Shauna Barbee | Director, Vice President | 1 | $0 | $0 | $0 | $0 |
| Doug Hamik | Director, President | 2 | $0 | $0 | $0 | $0 |
| Eric Nickell | Director, Treasurer | 2 | $0 | $0 | $0 | $0 |
Joan Blossom
Director, Secretary
$0
Hrs/Wk
2
Compensation
$0
Related Orgs
$0
Other
$0
Shauna Barbee
Director, Vice President
$0
Hrs/Wk
1
Compensation
$0
Related Orgs
$0
Other
$0
Doug Hamik
Director, President
$0
Hrs/Wk
2
Compensation
$0
Related Orgs
$0
Other
$0
Eric Nickell
Director, Treasurer
$0
Hrs/Wk
2
Compensation
$0
Related Orgs
$0
Other
$0
Highest compensated employees who are not officers or directors.
| Name | Title | Hrs/Wk | Compensation | Related Orgs | Other | Total |
|---|---|---|---|---|---|---|
| Paula Bragg | Executive Director | 40 | $102.1K | $0 | $0 | $102.1K |
Paula Bragg
Executive Director
$102.1K
Hrs/Wk
40
Compensation
$102.1K
Related Orgs
$0
Other
$0
Members of the governing board. Board members often serve without compensation.
| Name | Title | Hrs/Wk | Compensation | Related Orgs | Other | Total |
|---|---|---|---|---|---|---|
| Deb Paulsen | Director | 1 | $0 | $0 | $0 | $0 |
| Monique Rhoades | Director | 1 | $0 | $0 | $0 | $0 |
Deb Paulsen
Director
$0
Hrs/Wk
1
Compensation
$0
Related Orgs
$0
Other
$0
Monique Rhoades
Director
$0
Hrs/Wk
1
Compensation
$0
Related Orgs
$0
Other
$0
| $1.1M |
| $1.1M |
| 2020 | $1.3M | $1.3M | $1.1M | $1.1M | $980.4K |
| 2019 | $880K | $859.1K | $817.4K | $775.2K | $737.9K |
| 2018 | $450.1K | $433.5K | $485.5K | $662K | $609.9K |
| 2017 | $477.6K | $454.9K | $413K | $683.6K | $645.3K |
| 2016 | $414.4K | $402K | $377K | $620.6K | $580.7K |
| 2015 | $492.7K | $483.7K | $442.6K | $593.9K | $543.2K |
| 2014 | $455.6K | $439.4K | $460.8K | $563.6K | $493.1K |
| 2013 | $455.6K | $436.2K | $462.5K | $501.3K | $461.3K |
| 2012 | $318.1K | $311.2K | $337.7K | $473.3K | $431.2K |
| 2011 | $327.7K | $313K | $303.9K | $461.3K | $419.1K |
| 2021 | 990 | Data |
| 2020 | 990 | Data | PDF not yet published by IRS |
| 2019 | 990 | Data |
| 2018 | 990 | Data |
| 2017 | 990 | Data |
| 2016 | 990 | Data |
| 2015 | 990 | Data |
| 2014 | 990 | Data |
| 2013 | 990 | Data |
| 2012 | 990 | Data |
| 2011 | 990 | Data |
| 2010 | 990 | — |
| 2009 | 990 | — |
| 2008 | 990 | — |
| 2007 | 990 | — |