Total Federal Funding (partial)
$7B
Awards Found
50+
Additional awards may exist. View all on USAspending.gov →
Department of Transportation
$3.8B
THE PURPOSE OF THIS AWARD IS TO FUND A FY 2022-2023 FEDERAL STATE PARTNERSHIP NORTHEAST CORRIDOR PROGRAM GRANT FOR THE HUDSON TUNNEL PROJECT (THE PROJECT OR HTP) TO HELP ACHIEVE THE GOALS IDENTIFIED IN THE NOTICE OF FUNDING OPPORTUNITY FOR PROJECTS LOCATED ON THE NORTHEAST CORRIDOR FOR THE FEDERAL-STATE PARTNERSHIP FOR INTERCITY PASSENGER RAIL GRANTS PROGRAM, 87 FED. REG. 79421, DECEMBER 27, 2022 THAT SOLICITED APPLICATIONS FOR FEDERAL FINANCIAL ASSISTANCE. THE FSP-NEC PROJECT CONSISTS OF THREE ELEMENTS: 1) THE CONSTRUCTION OF A NEW HUDSON RIVER TUNNEL BETWEEN NEW YORK AND NEW JERSEY 2) THE REHABILITATION OF THE EXISTING NORTH RIVER TUNNEL UNDER THE HUDSON RIVER AND 3) LONG ISLAND RAIL ROAD (LIRR) EMERGENCY SERVICES BUILDING (ESB) UTILITY RELOCATION EARLY WORK ASSOCIATED WITH THE SEPARATELY FUNDED HUDSON YARDS CONCRETE CASING SECTION THREE (3) PROJECT. DELIVERABLES FOR THE PROJECT INCLUDE A PROJECT MANAGEMENT PLAN (PMP), FINAL DESIGN SET(S), A REAL ESTATE ACQUISITION MANAGEMENT PLAN (RAMP), CONTRACTOR PROPOSALS AND EXECUTED CONTRACTS, CONTRACTOR BUY AMERICA CERTIFICATION, AND A CONTRACTOR SAFETY PLAN.THE INTENDED BENEFICIARY AS A RESULT OF THIS PROJECT IS THE NATIONAL RAILROAD PASSENGER CORPORATION (AMTRAK).
Department of Transportation
$2.2B
APPLICATION PURPOSE: THE PURPOSE IS TO CONSTRUCT THE HUDSON TUNNEL PROJECT (HTP).; ACTIVITIES PERFORMED: THE HTP INCLUDES THREE ELEMENTS: 1) THE CONSTRUCTION OF A NEW HUDSON RIVER TUNNEL BETWEEN NEW YORK AND NEW JERSEY; 2) THE REHABILITATION OF THE EXISTING NORTH RIVER TUNNEL UNDER THE HUDSON RIVER; AND 3) LONG ISLAND RAIL ROAD (LIRR) EMERGENCY SERVICES BUILDING (ESB) UTILITY RELOCATION EARLY WORK ASSOCIATED WITH THE SEPARATELY FUNDED HUDSON YARDS CONCRETE CASING SECTION 3 PROJECT.; EXPECTED OUTCOMES: THE PURPOSE OF THE HTP IS TO PRESERVE THE CURRENT FUNCTIONALITY OF AMTRAKS NORTHEAST CORRIDOR (NEC) SERVICE AND NJ TRANSITS COMMUTER RAIL SERVICE BETWEEN NEW JERSEY AND PSNY BY REPAIRING THE DETERIORATING NORTH RIVER TUNNEL; AND TO STRENGTHEN THE NECS RESILIENCY TO SUPPORT RELIABLE SERVICE BY PROVIDING REDUNDANT CAPABILITY UNDER THE HUDSON RIVER FOR AMTRAK AND NJ TRANSIT NEC TRAINS BETWEEN NEW JERSEY AND PSNY. THESE IMPROVEMENTS MUST BE ACHIEVED WHILE MAINTAINING UNINTERRUPTED COMMUTER AND INTERCITY RAIL SERVICE AND BY OPTIMIZING THE USE OF EXISTING INFRASTRUCTURE. AT THE COMPLETION OF THE HTP THE NEC WOULD HAVE FOUR TRACKS (TWO IN THE NEW HUDSON TUNNEL AND TWO IN THE NORTH RIVER TUNNEL) BETWEEN NEW YORK AND NEW JERSEY UNDER THE HUDSON RIVER. NO CHANGES TO PSNY PLATFORMS OR PLATFORM TRACKS ARE PROPOSED AS PART OF THE HTP SINCE PSNY IS OUTSIDE OF THE HTP PROJECT AREA THEREFORE THE CURRENT OPERATIONAL CAPACITY OF PSNY WILL BE MAINTAINED AT THE LEVEL IT IS TODAY.; INTENDED BENEFICIARIES: THE HTP WILL ALLOW MULTIPLE NJ TRANSIT RAIL SERVICES THROUGHOUT THE STATE TO FEED INTO AND UTILIZE THE TUNNEL AND PSNY. THESE IMPORTANT RAIL CONNECTIONS FACILITATE THE MOVEMENT OF OVER 200000 TRAIN PASSENGERS TRIPS PER DAY BETWEEN NEW YORK AND NEW JERSEY.; SUBRECIPIENT ACTIVITIES: GDC DOES NOT HAVE ANY SUB-RECIPIENTS.
Department of Transportation
$75M
THIS AWARD UTILIZES ARP FUNDING TO PREVENT PREPARE FOR AND RESPOND TO CORONAVIRUS. THIS APPLICATION APPLIES FOR $75029220 IN ARP ADDITIONAL ASSISTANCE FUNDS TO SUPPORT THE PROJECTS INCLUDED BY THE FOLLOWING UZA APPORTIONMENTS:FFY21 ARP SECTION 5307 SAN FRANCISCO-OAKLAND UZA (UZA #78904): $75029220 TOTAL ELIGIBLE PROJECT COST: $75029220 GOLDEN GATE BRIDGE HIGHWAY TRANSPORTATION DISTRICT IS HEREBY SUBMITTING THIS GRANT APPLICATION IN SUPPORT OF THE FOLLOWING PROJECT:1. OPERATING ASSISTANCETHIS GRANT IS REQUESTING $75029220 OF FFY21 FEDERAL SECTION 5307 ARP FUNDS TO SUPPORT THE OPERATING ASSISTANCE FOR THE PERIOD OF JANUARY 20 2020 THROUGH JUNE 30 2026.OUR ESTIMATED OPERATING BUDGET FOR JULY 1 2021 TO JUNE 30 2022 IS $146346800. WE DEVELOPED OUR REQUEST BASED ON THE MOST RECENT YEARS NTD DATA.PURPOSE: THE PURPOSE OF THIS AWARD IS TO USE ARP FUNDS TO PREVENT PREPARE FOR AND RESPOND TO CORONAVIRUS.ACTIVITIES TO BE PERFORMED: ACTIVITIES INCLUDE ALL REGULAR TRANSIT OPERATIONS AND ADMINISTRATION NECESSARY TO PROVIDE TRANSIT SERVICE.EXPECTED OUTCOMES: THE EXPECTED OUTCOME OF THIS AWARD IS THE PROVISION OF TRANSIT SERVICE DURING THE COVID-19 PANDEMIC.INTENDED BENEFICIARIES: THIS AWARD WILL BENEFIT GOLDEN GATE TRANSIT AND GOLDEN GATE FERRY PATRONS AND ALL USERS OF THE HIGHWAY 101 CORRIDOR.SUBRECIPIENTS: THIS AWARD HAS NO SUBRECIPIENTS.THE RECIPIENT AGREES THAT IF IT RECEIVES FEDERAL FUNDING FROM THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) OR THROUGH A PASS-THROUGH ENTITY THROUGH THE ROBERT T. STAFFORD DISASTER RELIEF AND EMERGENCY ASSISTANCE ACT A DIFFERENT FEDERAL AGENCY OR INSURANCE PROCEEDS FOR ANY PORTION OF A PROJECT ACTIVITY APPROVED FOR FTA FUNDING UNDER THIS GRANT AGREEMENT IT WILL PROVIDE WRITTEN NOTIFICATION TO FTA AND REIMBURSE FTA FOR ANY FEDERAL SHARE THAT DUPLICATES FUNDING PROVIDED BY FEMA ANOTHER FEDERAL AGENCY OR AN INSURANCE COMPANY.PER ARP THE PROJECT IN THIS APPLICATION IS NOT REQUIRED TO BE PROGRAMMED IN THE LONG-RANGE TRANSPORTATION PLAN OR STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM.
Department of Transportation
$64.3M
APPLICATION PURPOSE: THE PURPOSE OF THIS PROJECT IS TO REHABILITATE AND REPLACE THE GANGWAYS FLOATS AND ASSOCIATED PIER SYSTEMS THAT PROVIDE PASSENGER ACCESS BETWEEN GOLDEN GATE FERRY VESSELS AND TERMINALS. THESE UPGRADES WILL IMPROVE SAFETY ACCESSIBILITY AND OPERATIONAL RELIABILITY ACROSS THE DISTRICTS FERRY NETWORK ENSURING COMPLIANCE WITH CURRENT DESIGN AND ACCESSIBILITY STANDARDS AND EXTENDING THE USEFUL LIFE OF CRITICAL FERRY TERMINAL INFRASTRUCTURE.THIS PROJECT SUPPORTS THE FEDERAL TRANSIT ADMINISTRATIONS (FTA) STATE OF GOOD REPAIR (SECTION 5337) PROGRAM GOAL OF MAINTAINING FIXED-GUIDEWAY AND FERRY SYSTEMS IN A STATE OF GOOD REPAIR AND ENSURING SAFE RELIABLE TRANSPORTATION FOR THE TRAVELING PUBLIC.; ACTIVITIES PERFORMED: THE PROJECT WILL INCLUDE THE DESIGN ENVIRONMENTAL CLEARANCE PROCUREMENT FABRICATION AND INSTALLATION OF NEW GANGWAYS FLOATS AND PIER COMPONENTS AT SELECTED DISTRICT FERRY TERMINALS. SPECIFIC ACTIVITIES INCLUDE:1.COMPLETION OF THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) PROCESS AND RECEIPT OF FEDERAL ENVIRONMENTAL APPROVAL.2.FINAL DESIGN AND ENGINEERING OF REPLACEMENT GANGWAY AND FLOAT SYSTEMS.3.PROCUREMENT OF CONSTRUCTION SERVICES FABRICATION OF COMPONENTS AND ON-SITE INSTALLATION.4.TESTING AND COMMISSIONING OF UPGRADED FACILITIES TO ENSURE COMPLIANCE WITH ADA SEISMIC AND SAFETY STANDARDS.PROJECT IMPLEMENTATION WILL OCCUR FOLLOWING NEPA CLEARANCE AND FTA CONCURRENCE.; EXPECTED OUTCOMES: REPLACEMENT OF AGING GANGWAY AND FLOAT SYSTEMS WITH MODERN ADA-COMPLIANT STRUCTURES.IMPROVED PASSENGER SAFETY OPERATIONAL EFFICIENCY AND SYSTEM RELIABILITY.EXTENDED SERVICE LIFE OF FERRY TERMINAL ASSETS SUPPORTING ONGOING SYSTEM RESILIENCY.COMPLIANCE WITH FEDERAL ENVIRONMENTAL SAFETY AND ACCESSIBILITY REGULATIONS.THE PROJECT WILL MAINTAIN VITAL FERRY ACCESS INFRASTRUCTURE AND ENHANCE THE OVERALL PASSENGER EXPERIENCE THROUGH IMPROVED BOARDING SAFETY AND ACCESSIBILITY.; INTENDED BENEFICIARIES: THE INTENDED BENEFICIARIES INCLUDE FERRY PASSENGERS TRAVELING BETWEEN MARIN COUNTY AND SAN FRANCISCO PARTICULARLY DAILY COMMUTERS AND TOURISTS WHO DEPEND ON SAFE RELIABLE AND ACCESSIBLE FERRY CONNECTIONS. THE PROJECT ALSO BENEFITS THE BROADER REGIONAL TRANSPORTATION NETWORK BY MAINTAINING CRITICAL WATERBORNE TRANSIT INFRASTRUCTURE THAT SUPPORTS CONGESTION RELIEF AND ENVIRONMENTAL SUSTAINABILITY OBJECTIVES THROUGHOUT THE BAY AREA.; SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENTS FOR THIS PROJECT. ALL ACTIVITIES WILL BE CARRIED OUT DIRECTLY BY THE GOLDEN GATE BRIDGE HIGHWAY TRANSPORTATION DISTRICT.
Department of Transportation
$59.7M
GGBHTD FFY21 5307-8 CRRSAA GRANT TRANCHE I - OPERATING ASSISTANCE
Department of Transportation
$57.7M
THIS APPLICATION UTILIZES ARP FUNDING TO PREVENT PREPARE FOR AND RESPOND TO CORONAVIRUS. THIS GRANT APPLIES FOR $57697418 IN ARP FUNDS TO SUPPORT THE PROJECTS INCLUDED IN THIS APPLICATION BY THE FOLLOWING UZA APPORTIONMENTS: FFY21 ARP SECTION 5307-9 SAN FRANCISCO-OAKLAND UZA (UZA #78904): $50994092FFY21 ARP SECTION 5307-9 SANTA ROSA UZA (UZA #78904): $6703326TOTAL ELIGIBLE PROJECT COST: $57697418GOLDEN GATE BRIDGE HIGHWAY TRANSPORTATION DISTRICT IS HEREBY SUBMITTING THIS GRANT APPLICATION IN SUPPORT OF THE FOLLOWING PROJECT: 1. OPERATING ASSISTANCE THIS GRANT IS REQUESTING $57697418 OF FFY21 FEDERAL SECTION 5307-9 ARP FUNDS TO SUPPORT THE OPERATING ASSISTANCE FOR THE PERIOD OF JANUARY 20 2020 THROUGH JUNE 30 2023. OUR ESTIMATED OPERATING BUDGET FOR JULY 1 2020 TO JUNE 30 2021 IS $146346700. WE DEVELOPED OUR REQUEST BASED ON THE MOST RECENT YEARS NTD DATA.PURPOSE: THE PURPOSE OF THIS AWARD IS TO USE ARP FUNDS TO PREVENT PREPARE FOR AND RESPOND TO CORONAVIRUS.ACTIVITIES TO BE PERFORMED: ACTIVITIES INCLUDE ALL REGULAR TRANSIT OPERATIONS AND ADMINISTRATION NECESSARY TO PROVIDE TRANSIT SERVICE.EXPECTED OUTCOMES: THE EXPECTED OUTCOME OF THIS AWARD IS THE PROVISION OF TRANSIT SERVICE DURING THE COVID-19 PANDEMIC.INTENDED BENEFICIARIES: THIS AWARD WILL BENEFIT GOLDEN GATE TRANSIT AND GOLDEN GATE FERRY PATRONS AND ALL USERS OF THE HIGHWAY 101 CORRIDOR.SUBRECIPIENTS: THIS AWARD HAS NO SUBRECIPIENTS.THE RECIPIENT AGREES THAT IF IT RECEIVES FEDERAL FUNDING FROM THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) OR THROUGH A PASS-THROUGH ENTITY THROUGH THE ROBERT T. STAFFORD DISASTER RELIEF AND EMERGENCY ASSISTANCE ACT A DIFFERENT FEDERAL AGENCY OR INSURANCE PROCEEDS FOR ANY PORTION OF A PROJECT ACTIVITY APPROVED FOR FTA FUNDING UNDER THIS GRANT AGREEMENT IT WILL PROVIDE WRITTEN NOTIFICATION TO FTA AND REIMBURSE FTA FOR ANY FEDERAL SHARE THAT DUPLICATES FUNDING PROVIDED BY FEMA ANOTHER FEDERAL AGENCY OR AN INSURANCE COMPANY.PER ARP THE PROJECT IN THIS APPLICATION IS NOT REQUIRED TO BE PROGRAMMED IN THE LONG-RANGE TRANSPORTATION PLAN OR STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM.
Department of Transportation
$43.9M
THIS AWARD UTILIZES ARP FUNDING TO PREVENT PREPARE FOR AND RESPOND TO CORONAVIRUS. THIS APPLICATION APPLIES FOR $43855222 IN ARP FUNDS TO SUPPORT THE PROJECTS INCLUDED BY THE FOLLOWING UZA APPORTIONMENTS: FFY21 ARP SECTION 5307-9 SAN FRANCISCO-OAKLAND UZA (UZA #78904): $42091837FFY21 ARP SECTION 5307-9 SANTA ROSA UZA (UZA #78904): $1763385TOTAL ELIGIBLE PROJECT COST: $43855222GOLDEN GATE BRIDGE HIGHWAY TRANSPORTATION DISTRICT IS HEREBY SUBMITTING THIS GRANT APPLICATION IN SUPPORT OF THE FOLLOWING PROJECT: 1. OPERATING ASSISTANCE THIS GRANT IS REQUESTING $43855222 OF FFY21 FEDERAL SECTION 5307-9 ARP FUNDS TO SUPPORT THE OPERATING ASSISTANCE FOR THE PERIOD OF JANUARY 20 2020 THROUGH JUNE 30 2024. OUR ESTIMATED OPERATING BUDGET FOR JULY 1 2021 TO JUNE 30 2022 IS $146346800. WE DEVELOPED OUR REQUEST BASED ON THE MOST RECENT YEARS NTD DATA. PURPOSE: THE PURPOSE OF THIS AWARD IS TO USE ARP FUNDS TO PREVENT PREPARE FOR AND RESPOND TO CORONAVIRUS. ACTIVITIES TO BE PERFORMED: ACTIVITIES INCLUDE ALL REGULAR TRANSIT OPERATIONS AND ADMINISTRATION NECESSARY TO PROVIDE TRANSIT SERVICE. EXPECTED OUTCOMES: THE EXPECTED OUTCOME OF THIS AWARD IS THE PROVISION OF TRANSIT SERVICE DURING THE COVID-19 PANDEMIC. INTENDED BENEFICIARIES: THIS AWARD WILL BENEFIT GOLDEN GATE TRANSIT AND GOLDEN GATE FERRY PATRONS AND ALL USERS OF THE HIGHWAY 101 CORRIDOR. SUBRECIPIENTS: THIS AWARD HAS NO SUBRECIPIENTS.THE RECIPIENT AGREES THAT IF IT RECEIVES FEDERAL FUNDING FROM THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) OR THROUGH A PASS-THROUGH ENTITY THROUGH THE ROBERT T. STAFFORD DISASTER RELIEF AND EMERGENCY ASSISTANCE ACT A DIFFERENT FEDERAL AGENCY OR INSURANCE PROCEEDS FOR ANY PORTION OF A PROJECT ACTIVITY APPROVED FOR FTA FUNDING UNDER THIS GRANT AGREEMENT IT WILL PROVIDE WRITTEN NOTIFICATION TO FTA AND REIMBURSE FTA FOR ANY FEDERAL SHARE THAT DUPLICATES FUNDING PROVIDED BY FEMA ANOTHER FEDERAL AGENCY OR AN INSURANCE COMPANY.PER ARP THE PROJECT IN THIS APPLICATION IS NOT REQUIRED TO BE PROGRAMMED IN THE LONG-RANGE TRANSPORTATION PLAN OR STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM.
Department of Transportation
$30.2M
GGBHTD FFY20 5307-6 CARES ACT GRANT - OPERATING ASSISTANCE
Department of Transportation
$25M
APPLICATION PURPOSE: TONNELLE AVENUE BRIDGE PROJECT WILL CONVERT A PORTION OF TONNELLE AVENUE INTO A NEW ROADWAY BRIDGE.; ACTIVITIES PERFORMED: TONNELLE AVENUE WILL INCLUDE THE FOLLOWING ELEMENTS:CONSTRUCTION: TONNELLE AVENUE IS DESIGNED TO OCCUR IN THREE PHASES SO THAT TRAFFIC FLOW IN BOTH DIRECTIONS CAN BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD. THE WEST SECTION OF THE BRIDGE (ALONG SOUTHBOUND TONNELLE AVENUE) IS PLANNED TO BE CONSTRUCTED FIRST FOLLOWED BY THE CENTER SECTION THEN THE EAST. TONNELLE AVENUE WILL PROVIDE ACCESS FOR CONSTRUCTION VEHICLES TO TRAVEL BETWEEN STAGING AREAS UTILIZED FOR THE HTP.PROFESSIONAL SERVICES: PROFESSIONAL SERVICES INCLUDE CONSTRUCTION MANAGEMENT PROJECT ADMINISTRATION INCLUDING STAFF COSTS PROGRAMMATIC COSTS AND OTHER THIRD-PARTY CONTRACTS. ADMINISTRATIVE SERVICES: ADMINISTRATIVE SERVICES WILL INCLUDE LEGAL PAYMENTS ASSOCIATED WITH NOISE MITIGATION MEASURES.; EXPECTED OUTCOMES: UPON COMPLETION THE TONNELLE AVENUE BRIDGE PROJECT WILL RESULT IN A NEW ROADWAY BRIDGE CARRYING TONNELLE AVENUE OVER A NEW RAILROAD RIGHT-OF-WAY FOR THE NEW HUDSON RIVER TUNNEL.; INTENDED BENEFICIARIES: THE HTP INCLUDES EFFORTS TO IMPROVE RACIAL EQUITY AND REDUCE BARRIERS TO OPPORTUNITY. THE TONNELLE AVENUE PROJECT AREA IS LOCATED WITHIN A FEDERALLY DESIGNATED OPPORTUNITY ZONE. IN AUGUST 2023 GDC ESTABLISHED A TWENTY-FOUR (24) HOUR HOTLINE AND A DEDICATED EMAIL TO MANAGE QUESTIONS AND INQUIRIES FROM THE COMMUNITY. A COMMUNITY LIAISON IS MONITORING THE HOTLINE AND EMAIL. ON AN AS-NEEDED BASIS GDC HAS DEVELOPED CONSTRUCTION FLYERS THAT DETAIL TRAFFIC UPDATES WHICH ARE SHARED WITH LOCAL ELECTED OFFICIALS. DURING CONSTRUCTION A COMMUNITY TRAILER WILL BE ESTABLISHED.; SUBRECIPIENT ACTIVITIES: GDC DOES NOT HAVE ANY SUBRECIPIENTS.
Department of Transportation
$21.4M
GGBHTD FFY20 5307-6 CARES ACT GRANT TRANCHE II - OPERATING ASSISTANCE
Department of Transportation
$19.9M
PURPOSE: RECONSTRUCT RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 6,600 FEET OF EXISTING CONCRETE RUNWAY 12R/30L THAT HAS REACHED THE END OF ITS USEFUL LIFE. . THIS GRANT FUNDS A PORTION OF THE FINAL PHASE, WHICH CONSISTS OF RECONSTRUCTION OF 3,645 FEET. THIS GRANT IS ASSOCIATED WITH AN AIRPORT INFRASTRUCTURE GRANT THAT FUNDS THE REMAINING ELIGIBLE PORTION OF THE PROJECT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Health and Human Services
$19.3M
HEAD START AND EARLY HEAD START
Department of Transportation
$18M
APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO PROVIDE FEDERAL FINANCIAL ASSISTANCE TO ACQUIRE ONE LOW EMISSION FERRY REPLACING A DIESEL FERRY TO SUPPORT THE DISTRICTS COMPLIANCE WITH THE CALIFORNIA AIR RESOURCE BOARD (CARB) COMMERCIAL HARBOR CRAFT REGULATIONS PLAN FOR AN ALTERNATIVE CONTROL OF EMISSIONS (ACE) STANDARD AND TO REPLACE MAJOR FERRY COMPONENTS ON GOLDEN GATE FERRY VESSELS TO ENSURE PASSENGER SAFETY AND OVERALL STATE OF GOOD REPAIR REQUIREMENTS ARE MET.; ACTIVITIES PERFORMED: 1.THE DEL NORTE II FERRY REPLACEMENT INVOLVES BUILDING ONE NEW LOW-EMISSION REPLACEMENT FERRY VESSEL.2.FERRY MAJOR COMPONENT REHABILITATION INVOLVES THE REPLACEMENT OF MAJOR FERRY COMPONENTS SUCH AS NAVIGATION SYSTEMS HULL INTERIOR LIFESAVING EQUIPMENT PROPULSION AND OTHER FERRY COMPONENTS.; EXPECTED OUTCOMES: THE EXPECTED OUTCOME OF THIS PROJECT WILL REDUCE CARBON EMISSIONS AND IMPROVE STATE OF GOOD REPAIR AND SAFETY FOR GOLDEN GATE FERRY VESSELS.; INTENDED BENEFICIARIES: BENEFICIARIES OF THE PROJECTS IN THIS GRANT APPLICATION INCLUDE ALL COMMUTERS TRAVELING BETWEEN SAN FRANCISCO AND MARIN COUNTY CALIFORNIA VIA THE US 101 HIGHWAY CORRIDOR.; SUBRECIPIENT ACTIVITIES: THERE IS NO SUBRECIPIENT ACTIVITY ASSOCIATED WITH THESE PROJECTS.
Department of Transportation
$17.9M
PURPOSE: RECONSTRUCT RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 6,600 FEET OF EXISTING CONCRETE RUNWAY 12R/30L THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS GRANT FUNDS A PORTION OF PHASE 1, WHICH CONSISTS OF RECONSTRUCTION OF 2,955 FEET. THIS GRANT IS ASSOCIATED WITH A BIPARTISAN INFRASTRUCTURE LAW AIRPORT GRANT THAT FUNDS THE REMAINING ELIGIBLE PORTION OF THE PROJECT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Transportation
$14.4M
PURPOSE: TERMINAL (PFC ONLY: GATES AND RELATED AREAS). ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXPANDS THE EXISTING TERMINAL BUILDING AN ADDITIONAL 21,000 SQUARE FEET TO INCLUDE FIVE GATES AND RELATED AREAS UNDER THE EXPANDED ELIGIBILITY OF THE BIPARTISAN INFRASTRUCTURE LAW. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Health and Human Services
$14.1M
HOPE IN APPALACHIA (PROJECT HOPE)
Department of Health and Human Services
$12.7M
HEAD START AND EARLY HEAD START
Department of Transportation
$11.7M
PURPOSE: CONSTRUCT CONTRACT TOWER. THIS GRANT INCLUDES FUNDING BY THE AMERICAN RESCUE PLAN ACT OF 2021 TO INCREASE THE FEDERAL SHARE TO 100 PERCENT FOR THE AIRPORT IMPROVEMENT PROGRAM (AIP). ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT CONSTRUCTS A REPLACEMENT SPONSOR-OWNED AIR TRAFFIC CONTROL TOWER APPROVED FOR ACCEPTANCE IN THE FEDERAL CONTRACT TOWER PROGRAM. THIS GRANT FUNDS THE FINAL PHASE, WHICH CONSISTS OF CONSTRUCTION. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Transportation
$9.9M
PURPOSE: RECONSTRUCT RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 9,300 FEET OF THE EXISTING RUNWAY 12C/30C PAVEMENT THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS GRANT FUNDS THE FIRST PHASE, WHICH CONSISTS OF CONSTRUCTION OF THE SOUTHERN 3,000 FEET OF RUNWAY 12C/30C. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Department of Education
$9.9M
HIGHER EDUCATION HIGHER EMERGENCY RELIEF GRANT - INSTITUTIONAL PORTION
Department of Education
$9.7M
GATEWAY TECHNICAL COLLEGE EMERGENCY RELIEF FUNDING
Department of Health and Human Services
$9.5M
GATEWAY HEALTH PROFESSIONS OPPORTUNITIES PROGRAM
Department of Housing and Urban Development
$9.4M
SUPPORTIVE HOUSING FOR THE ELDERLY
Department of State
$8.8M
THE FUELING AI INNOVATION AND ADOPTION PROGRAM (FAIIA) ADDRESSES FOUNDATIONAL BARRIERS TO AI DEPLOYMENT AND ADOPTION ABROAD. FAIIA PROMOTES THE U.S. APPROACH TO AI INNOVATION, COMPETITION, APPLICATION, AND GOVERNANCE.
Department of Transportation
$8.2M
PURPOSE: AMERICAN RESCUE PLAN ACT AWARDED AS ECONOMIC ASSISTANCE TO ELIGIBLE U.S. AIRPORTS AND ELIGIBLE CONCESSIONS AT THOSE AIRPORTS TO PREVENT, PREPARE FOR, AND RESPOND TO THE COVID-19 PANDEMIC. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS GRANT PROVIDES ECONOMIC RELIEF FUNDS FOR COSTS RELATED TO OPERATIONS, PERSONNEL, CLEANING, SANITIZATION, JANITORIAL SERVICES, DEBT SERVICE PAYMENTS, AND COMBATING THE SPREAD OF PATHOGENS AT THE AIRPORT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MESA, ARIZONA.
Source: Federal Audit Clearinghouse (fac.gov)
No federal single audit records found for this organization.
Single audits are required for entities expending $750,000+ in federal awards annually.
Source: IRS e-Filed Form 990
No officer or director compensation data available for this organization.
This data is sourced from IRS Form 990, Part VII. It may not be available if the organization files Form 990-N (e-Postcard) or has not yet been enriched.
Source: IRS Publication 78, Auto-Revocation List & e-Postcard Data
Tax-deductible contributions: Yes
Deductibility code: PC
Organizations with annual gross receipts of $50,000 or less file the simplified Form 990-N instead of a full Form 990. These filings contain minimal financial data and are not included in ProPublica's database.
View on ProPublica Nonprofit Explorer →Federal grants: USAspending.gov (live)
Organization info: IRS Business Master File · ProPublica Nonprofit Explorer
Tax-deductibility: IRS Publication 78